NCC 2022 Part 4.1: Before You Choose a Slab, Check the Scope
Before choosing a footing or slab detail, check whether it applies. Part 4.1 introduces the scope, conditions and terminology that make Section 4 useful on the right project.
NCC 2022 Part 3.4: Termite Protection Is a System, Not a Sticker
Termite protection is more than a treatment certificate. NCC 2022 Part 3.4 requires an integrated system covering vulnerable elements, penetrations, perimeters, attachments and ongoing inspection.